Engineering

Built like a
product. Not a
kit.

Fortune’s commitment goes past the modular court. Design, install guidance, maintenance and the next model — the same system India now plugs into.

Materials

Glass

12 mm EN12150-2

Eighteen 1996 × 3000 mm tempered lights. Impact-resistant, optically clear, the wall the ball is allowed to use.

Steel

Q235B + zinc + powder

Columns to 4 m. Ultra steps up to 5 mm plate. Surface treatment for corrosion and eight (or custom) colours.

Turf

KDK monofilament

Typically 12 mm, 52,500 stitches/m², 9000 Dtex, EN14041. Quartz infill 10 kg/m². Ultra uses a 10 mm / 13,500 Dtex PU-backed yarn.

Light

300–400 lux

Four towers, poles to 6 m, I / Z / C styles. Standard 8 × 200 W IP65. Ultra: 400 W / 400 lux / IP66.

Install reality

Foundation first.
Then the week.

Outdoor slabs 20–25 cm, level, drained. After that, 1–2 weeks to stand the court. Fortune can send engineers; the client covers travel. Or we brief a local crew and stay on the critical steps.